Pennsylvania Bids > Bid Detail

Environemental, engineering, and Stormwater management

Agency: Commonweath of Pennsylvania
Level of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
Opps ID: NBD15736065442133970
Posted Date: Feb 11, 2019
Due Date: Feb 21, 2019
Solicitation No: E04576
Source:

To access the bid document, please visit the agency's website at below and search by your matched keyword:

http://www.dot14.state.pa.us/E...
Advertisement - Open End -

Various Engineering Services and Environmental Studies

Special Comments

This agreement may utilize federal funding however due to the low dollar value there will be no DBE goal.

The anticipated date of selection for this agreement is 04/10/2019, with a NTP on the first work order anticipated for 05/15/2019.

General
Initiating Organization:
Engineering District 3-0 Status: Published
Agreement Type: Open End
Open End Sub-Type: Non Project Specific
100% State Funded: No
Services Requested: Design and Misc Services
Selection Process: Modified
SOI Deadline: 02/21/2019
Agreements:
E04576 Environemental, engineering, and Stormwater management

* This advertisement was created from Agreement E04576
Services
The Department of Transportation will retain a consultant firm for (1) open-end agreement for the services indicated below on various projects. The projects are administered by Engineering District 3-0 and are located in Engineering District 3-0. The Agreement will be for a period of 5 years. with projects assigned on an as-needed basis. The maximum amount of the Open-end Agreement will be 350,000 dollars.
Selection Criteria
The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking.

The following factors, listed in order of importance, will be considered by the Department during the evaluation of the business partners submitting statements of interest:
Criteria Description Weight
ABILITY TO PERFORM WORK - Past and current performance of firm on department projects (list nos. as applicable); specialized skills of personnel; and the availability of staff to perform anticipated work. 30%
QUALITY CONTROL (QA/QC) PLAN - How will the consultant team assure the department that it will provide a quality construction plan? Clearly describe method of controlling the quality of project plans and submissions by outlining a project specific QA/QC Plan. 25%
PROJECT DELIVERY - How will the consultant team pursue project delivery in relation to developing and meeting both normal and accelerated design and construction project schedules? 25%
COST EFFECTIVE TECHNIQUES FOR CONSTRUCTION - What will the consultant team do to ensure that a cost-effective construction project will be designed? 10%
TECHNIQUES FOR DESIGN & MAINTENANCE - Specific approach/methodology for managing the design and minimizing future maintenance of the project? 10%
Weight Total: 100%
Work Task

The work and services which may be required under this Agreement encompass a wide range of environmental studies and engineering efforts with the possibility of several different types of projects with short completion schedules being assigned concurrently. The anticipated types of projects include but not limited to: bridge replacements or bridge rehabilitation with minor approach work, environmental studies, roadway betterments (3R type), minor capital improvement projects (bridges or roadway), railroad grade crossing projects, and minor location studies, etc.



The engineering work and services that may be required under this contract include, but are not limited to: perform field surveys, plot topography and cross sections, prepared submission for utility verification and relocations engineering, prepare all pertinent submissions and materials necessary for the Department to prepare the application to PUC and for the PUC field conference, attend and supply and required information for all PUC meetings and hearings during the design of the project, develop erosion control details and narrative, prepare right of way plans, complete structure designs include type, size and location reports, core boring layouts and foundation designs and reports, develop traffic control plans with narratives, conduct soils investigations and prepare soil reports, investigate utility involvement on the projects, provide material for and participate in value engineering reviews, coordinate contracts with railroad officials and procure railroad related costs, permits, and insurance, collect signal timing, accident data and other traffic flow data, document engineering study findings and activities, perform alternative analysis to assess and mitigate impacts, and prepare construction plans, specifications, and estimates. Additionally, assistance to ensure compliance with the Departments Stormwater Control Measure Maintenance Manual will likely be required. These engineering services identified are the general work activities that can be expected under this Open-end Agreement. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Open-end Agreement.



The areas of environmental study which may be required under the Agreement include, but are not limited to: air quality, noise energy vibration, hazardous waste, surface water and ground water quality, surface water and ground water hydrology, terrestrial ecology including threatened and endangered species, wetlands, soils, geology, farmlands, visual, quality socioeconomic resources, cultural resources, Section 4(f) Evaluations, early coordination and scoping correspondence meeting, minutes, public meeting and hearing presentations, visualization materials, handouts, and displays, technical basis reports (TBRs), and/or technical files, NEPA environmental documents, Section 106 documents, mitigation plans and reports, wetland and floodplain findings, and preliminary engineering plans, and remote sensing/mapping innovations. The format and content of all documents will be consistent with applicable State and Federal regulations, policies and guidelines. Additionally, assistance to ensure compliance with the Departments Stormwater Control Measure Maintenance Manual will likely be required. These environmental studies identified are the general work activities that can be expected under this Open-end Agreement. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Open-end Agreement.

Requirements

The anticipated date of selection for this agreement is 04/10/19, with a NTP on the first work order anticipated for 05/15/2019.

This Open End Agreement may be utilized for various Department AND/OR local project sponsor projects located within the District.



All questions and answers are required to go through ECMS's "Questions and Responses" forum.

The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 0 of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below.

The engineering services and environmental studies identified above are the general work activities that can be expected under this Open-end Contract. A more specific and project-related Scope of Work will be outlined for each individual Work Order developed under this Open-end Contract.

Additional information regarding this Agreement/Advertisement and Statement of Interest requirements are contained in the General Requirements document.
Attachment
There is no file attachment.
Questions and Responses New
No records found.
Contact Information
Name Email Phone Fax Org
Kyle J. Bunce kbunce@state.pa.us (570) 368-4409 (570) 368-4321 0300
History
Published SOI Deadline Revised Description
02/11/2019 02/21/2019

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >