Pennsylvania Bids > Bid Detail

Mount Aloysius to Downtown Cresson Sidewalk

Agency: Commonweath of Pennsylvania
Level of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
Opps ID: NBD15736308419338364
Posted Date: May 13, 2019
Due Date: Jun 20, 2019
Solicitation No: 111480
Source:

To access the bid document, please visit the agency's website at below and search by your matched keyword:

http://www.dot14.state.pa.us/E...
Bid Package
Project: Go Municipal / PENNDOT Oversight Non-NHS Advertised
Short Description: Mount Aloysius to Downtown Cresson Sidewalk Org Code: 0900
County: Cambria SR: 2014 Section: MAS
District: 09 Group ID: --- Municipality: CRESSON
Overview
Type Plans Special Provisions Items Attachments Report Other Let
Current 06/20/2019 11:00:00 AM
Original 06/20/2019 11:00:00 AM
General
Status: Published Bid Results
Version: 1
Project Cost Range: $200,000.00 - $499,999.99
Federal Project Status: PENNDOT Oversight Non-NHS DBE: 7%
Let: 06/20/2019 11:00:00 AM Structure Work: 0.00%
Let Type: Scheduled Pre-Bid Meeting: None
Anticipated NTP: 09/16/2019 Wage Rates: Yes
Required Completion: 11/05/2019 Prequalification Requirement: Yes
State Type of Work: MISCELLANEOUS Prequalified Subs as Prime: No
408 Version: 2016-6
Asphalt/Cement Price Index Diesel Fuel Price Index
Additional Information
This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Description
This project is the construction of a pedestrian facility (sidewalk) from Mount Aloysius College to the Cresson Business District about 1,455 lineal feet. The sidewalk will establish a continuous public sidewalk system that will connect the College campus with the Cresson Business District. It will be used by pedestrians in this general area to facilitate access to businesses in Downtown Cresson. A standard 5ft wide concrete sidewalk with approximately 180 lineal feet on private College property with the remaining approximate 1,430 lineal feet located in PennDot Right-of-Way along the south side of Admiral Peary Highway. All associated work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 2014, SECTION MAS, in CAMBRIA COUNTY, CRESSON BOROUGH AND CRESSON TOWNSHIP.
Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time.
Questions and Responses New
No records found.
Workflow
Status Name Disposition Date/Time
Draft Charles E Saylor/PennDOT Publish 05/13/2019 09:34:03 AM
Audit Information
Created By Created On Modified By Modified On
Charles E Saylor/PennDOT 04/11/2019 08:11:26 AM ECMS System/PennDOT 05/13/2019 09:42:34 AM

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >