Description:
|
All bid documents are available on
PennBid
. Sealed bids shall be submitted online via PennBid by June 6th, 2023, at 12:00 pm. Contractor shall provide all labor, material, equipment and services for a complete cured-in-place pipe (CIPP) lining system including but not limited to pre-installation cleaning and televising, installation of CIPP liner, sealing of all laterals, and post installation televising and inspection.
|
Publication Date/Time:
|
5/19/2023 1:00 PM
|
Closing Date/Time:
|
6/6/2023 12:00 PM
|
|