Pennsylvania Bids > Bid Detail

NFPC FOUNDRY MOLD HEATERS

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • 36 - Special Industry Machinery
Opps ID: NBD00159112877951042
Posted Date: Aug 29, 2023
Due Date: Sep 5, 2023
Solicitation No: N6449823Q5186
Source: https://sam.gov/opp/993614587e...
Follow
NFPC FOUNDRY MOLD HEATERS
Active
Contract Opportunity
Notice ID
N6449823Q5186
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSEA
Sub Command
NAVSEA WARFARE CENTER
Office
NSWC PHILADELPHIA DIV
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Aug 29, 2023 01:20 pm EDT
  • Original Published Date: Aug 15, 2023 07:05 am EDT
  • Updated Date Offers Due: Sep 05, 2023 12:00 pm EDT
  • Original Date Offers Due: Aug 28, 2023 03:00 pm EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Sep 20, 2023
  • Original Inactive Date: Sep 12, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 3680 - FOUNDRY MACHINERY, RELATED EQUIPMENT AND SUPPLIES
  • NAICS Code:
    • 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
  • Place of Performance:
    Philadelphia , PA 19112
    USA
Description



Castec mold heaters are used to support production during in-process manufacturing within the foundry, BLDG 20 at NFPC. Due to their portability, the Castec mold heaters are stand-alone units with multiple exhaust ductwork ports which offer an easy method of heating molds in multiple locations while maintaining a small footprint. NFPC foundry has used these Castec mold heaters for decades and has designed molds to cohere to this heating method. The Castec mold heater units have special ductwork to allow employees to clamp flexible hosing to heaters which allows easy access to any point of casting to be heated to its own designated design temperature. This method of heating allows all moisture to properly be removed from sand casting prior to molten metal deposition, therefore mitigating the risk of potential explosion. The contractor shall procure and deliver all parts & equipment detailed in Section C, 3.0 - Statement of Work (SOW). This requirement is procured on a brand name basis and attached herein.




Attachments/Links
Attachments

Contact Information
Contracting Office Address
  • 5001 S BROAD STREET
  • PHILADELPHIA , PA 19112-1403
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >