Pennsylvania Bids > Bid Detail

Waste Oil Tank

Agency:
Level of Government: Federal
Category:
  • 54 - Prefabricated Structures and Scaffolding
Opps ID: NBD00159479108456977
Posted Date: Mar 15, 2024
Due Date: Mar 31, 2024
Source: https://sam.gov/opp/e2624b46f6...
Follow
Waste Oil Tank
Active
Contract Opportunity
Notice ID
N64498-24-SIMACQ-PD-1410-0090
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSEA
Sub Command
NAVSEA WARFARE CENTER
Office
NSWC PHILADELPHIA DIV
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 15, 2024 01:08 pm EDT
  • Original Response Date: Mar 31, 2024 05:00 pm EDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Apr 15, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 5430 - STORAGE TANKS
  • NAICS Code:
    • 332420 - Metal Tank (Heavy Gauge) Manufacturing
  • Place of Performance:
    Philadelphia , PA 19112
    USA
Description

SOURCES SOUGHT NOTICE FOR THE NAVAL SURFACE WARFARE CENTER PHILADELPHIA DIVISION (NSWCPD) IN SUPPORT OF THE NAVA FOUNDRY AND PROPELLER CENTER (NFPC).



NFPC requires horizontal storage tanks with a capacity and registered placard capacity less than or equal to 4999 gallons that meets UL-142 specifications.



Application: Aboveground



Type: DOUBLE WALL TYPE I 360



Material: Mild Carbon Steel



Tank Diameter not to exceed: 6'0"



Inner Shell: 1/4" Shell 1/4" Heads Outer Shell: 10 GA Shell 10 GA Heads



Thermal tank Insulation – a minimum of 2" Pour Foam between Inner and outer shells



24” Dia. Manway - Tight Bolt; Include: Gasket, Stainless Steel Nuts, Bolts & Washers



Saddles - UL Style (72" Dia.) and Seal Welded Saddles to Tank



The contractor is responsible for performing the tasks listed in Section 3.0, Requirements found in Attached SOW.





Attachments:



(1) Statement of Work (SOW) DRAFT



(2) Sources Sought Notice for NSWCPD








Attachments/Links
Contact Information
Contracting Office Address
  • 5001 S BROAD STREET
  • PHILADELPHIA , PA 19112-1403
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 15, 2024 01:08 pm EDTSources Sought (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >