OSM 17(6868)101.1
|
Solicitation/Project Title:
|
AMR Smoke Run E, Gulich Twp Ramey Boro, Clearfield
|
Description:
|
The principal items of work and approximate quantities are:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock, 3,300 L.F.
Access Road – AASHTO No. 1 Coarse Aggregate, 2,600 C.Y.
Access Road – PA DOT 2A Coarse Aggregate, 1,300 C.Y.
Grading, 98,950 C.Y.
Smooth-Interior Corrugated Polyethylene Pipe – Thirty-six Inch (36”) Diameter, 220 L.F.
Walking Trail, 1,330 S.Y.
Tree Planting, 110 Each,
Subsurface Drain – Twelve-Inch (12”) Perforated Smooth-Interior Corrugated
Polyethylene Pipe, 2,010 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 655 C.Y.